HOLLAND, MI (WHTC) – Beginning today, Holland city and BPW crews are spending the next two months widening East 16th Street between Hoover Avenue and Waverly Road from two to five lanes. This includes: Adding a center turn lane; installing a new water main with limited storm sewer work; putting in new curbs and gutters with ADA-compliant sidewalk ramps; a new sidewalk and road resurfacing. One lane of traffic will be maintained in each direction throughout the duration of this project.
Construction Begins on Another Holland Street
By Gary Stevens
Sep 1, 2015 | 3:15 PM

Hope, Red Wings Win on Saturday, GVSU, Blackhawks Fall
37m ago
miflippo / Depositphotos.com
Ex-Chihuahua attorney general accused of treason for allowing US participation in drug raid
39m ago
Rubio says Trump to take up to 60 days to weigh Russia sanctions
59m ago
Florida State RB Ousmane Kromah carted off with ankle injury
3h ago
Ryan Blaney's pole run at Phoenix sets up major Chase opportunity
4h ago
Woodside natural gas project unit paused after Greenpeace protest off Western Australia
4h ago
Sun Oct 18
Holland, MI, USA
Humidity: 62%



