HOLLAND, MI (WHTC) – The fourth and final heat recovery steam generator that the Holland BPW had shipped over from South Korea made its way to the Holland Energy Park construction site this morning. The generators will capture waste heat from the power generation process and use it to create steam needed to drive the turbine generator and ultimately an expanded downtown snowmelt system. One generator was conveyed from the Verplank Dock daily. The new plant should be operational in early 2017.
Generator Transit Completed Smoothly Across Holland
By Gary Stevens
Aug 12, 2015 | 6:19 PM

Ukrainian foreign minister says Russian-held town is a 'death trap' with starving residents
1h ago
Italian police clash with protesters in the centre of Milan
3h ago
Israeli settlers attack Palestinians, European diplomats in West Bank, Belgium says
4h ago
Maple Leafs F John Tavares (lower body) is week-to-week
3h ago
Czech PM Babis suffers setback in Senate elections
4h ago
Colts activate TE Will Mallory from IR
3h ago
Sat Oct 17
Holland, MI, USA
Wind/Dir: 39 MPH-SSW
Humidity: 67%



